FAQ

How far in advance should I book my bottling?

For the summer months (June-September) wineries typically book their bottling dates with us a year in advance. Summer dates are usually 100% booked by January. For the balance of the year, we can find a way to get someone in with a couple months of notice.

What forms should I complete prior to bottling?

The first step will be to decide where you would like the bottling to take place.

If we are bottling at your location, we will need the Mobile Bottling Work Order or Mobile Filtration Work Order completed. This gives us the necessary information to match you up with a truck that will work at your location as well as plan the number of days need to complete the project.

If you are planning to bottle at our facility we will need a Cellar Work Order and Facility Bottling Work Order. These are the primary documents we use to schedule and plan your bottling and can be completed online.

Which truck/bottling line is right for me?

We have a truck for just about every bottling situation. Here’s a quick overview:

Line 1

Bottling Capacity/Speed: top speed of 50 bottles/min; can produce between 1200-1500 cases per eight-hour day.

Size and Space Requirements: 34-ft. fifth wheel trailer, hauled by a separate tractor; requires approximately 80 feet in length and 50 feet in width to maneuver; a clear path of 12 feet wide by 14 feet tall allowing that no trees, bushes, or other obstacles obstruct or rub up against our equipment causing damage.

Read full specs here


Line 2

Bottling Capacity/Speed: top speed of 103 bottles/min; can produce between 2800-3200 cases per eight-hour day.

Size and Space Requirements: 53-ft. reefer trailer, hauled by a separate tractor; requires approximately 80 feet in length and 50 feet in width to maneuver; a clear path of 12 feet wide by 14 feet tall allowing that no trees, bushes, or other obstacles obstruct or rub up against our equipment causing damage.

Read full specs here

Line 3

Though retired, this line has bottled over 3,000,000 cases in her time


Line 4

Bottling Capacity/Speed: top speed of 85 bottles/min; can produce between 2500-2850 cases per eight-hour day. Can also bottle 1.5L bottles that are 17″ (430 mm) tall with up to 2.36″ (60 mm) corks. Truck includes a state of the art Bertolaso quad block (sparger, filler, corker, screw capper) and a Robino Gallidrino capsule applicator/spinner.

Size and Space Requirements: 48-ft. dock height trailer, hauled by trucking contractors; requires approximately 80 feet in length and 50 feet in width to maneuver; a clear path of 12 feet wide by 14 feet tall allowing that no trees, bushes, or other obstacles obstruct or rub up against our equipment causing damage.

Read full specs here

Line 5

Bottling Capacity/Speed: top speed of 100 bottles/min; can produce between 2900-3100 cases per eight-hour day. Line has several extras including a case gluer and printer.

Size and Space Requirements:53-ft. low profile trailer, hauled by a separate tractor; requires approximately 80 feet in length and 50 feet in width to maneuver; a clear path of 12 feet wide by 14 feet tall allowing that no trees, bushes, or other obstacles obstruct or rub up against our equipment causing damage.


Line 6

Bottling Capacity/Speed: top speed and case production dependent upon bottle format. Designed with large format in mind but can do 375ml and 750ml bottles. This line only needs about 10 minutes to change format sizes and features a combo capsule/labeler, capable of spot labeling.

Size and Space Requirements: 20-ft. trailer (known as “The Mini”), hauled by a standard pick-up truck.